October 2004


Date Activity
10-1
  • Clean up rest of brush from trees that were cut on E. Creek Rd.
  • Surveyor at old landfill marking out property lines.
  • Company rep. in to discuss maintenance costs of 1-MG water tank located on old Rt. 15.
  • Nickerson patch section of roof on Boro Hall.

10-4
  • State Pension allocation came today. Will put appropriate amounts in Police and Non-Uniform pension plans.
  • Dig up sewer lines on Schuylkill St. looking for infiltration, but not find anything.

10-5
  • Blacktop Granger St. where new water line was installed. Have to haul blacktop from Williamsport, because Mansfield plant is closed.
  • Budget meeting in morning.

10-6
  • Blacktop Granger and Hannibal Sts. Where new water lines were installed.
  • LIB Water rep. calibrate water source meters at Bellman Filter and Sportsman's Well.
  • Move monument from old Ambulance Bldg. to new Fire and Ambulance Bldg.
  • Zoning Hearing Board on Brooks home occupation request .

10-7
  • Finish blacktopping roads today. Will take roller back to rental store tomorrow morning.

10-8
  • Take picnic tables from Park to downtown parking lot for Octoberfest this weekend.
  • Send one employee to Morris Run to help install new water line to home. Will rebill Hamilton Twp. Water Authority.

10-11
  • Send two employees to work at Morris Run to install sewer line lateral. Will rebill Supervisors for labor, materials and equipment .
  • Council meeting.

10-12
  • Send three employees to Morris Run to install sewer laterals and meter pits. Will rebill for costs incurred by Boro.
  • Level site behind Low Income Housing in preparation for installing new 6" DIP to new KwickFill Store on Rt. 15. Interchange.

10-13
  • Send two employees to Morris Run to tap water line for new: subdivision. Will rebill Hamilton Twp. Authority for costs.
  • Rest of crew work on replumbing water line behind Low Income Housing to get ready for new 6"-DIP water line to new KwickFill Store.

10-14
  • Work with Lisowski on water line to new KwickFill Store.

10-15
  • 15 Install water line. main to new KwickFill Store with Lisowski Contracting.

10-18
  • Work with Lisowski installing water main to new KwickFill Store. Tap 1" Corp. to store and set curb box.
  • Talk to homeowner next to KwickFill site who wants water service from Authority.

10-19
  • Rain last night and today. Not work on 6" water line.
  • Install repaired pump in sludge tank at stp.
  • Budget Committee finalize 2005 budget and will present to Council at next meeting.

10-20
  • Rain in morning. Not work on 6" water line.
  • Work on equipment at garage.

10-21
  • Work on repairing lights on garbage truck.
  • Install 6" DIP water line up to area where it will be connected into existing 4" line. Install 6" valve at end of 6"DIP.

10-22
  • Pressurize. new 6"DIP water line and bleed off air. Will let sit over weekend to disinfect .
  • Install water line to home next to new KwickFill store. Will rebill for time and material.
  • Put out 62 delinquent stickers today.

10-25
  • Work on new 6"DIP water line on old Rt. 15. Flush new line in morning and then tie new line into existing 4" line in the afternoon. Abandon old water line under new KwickFill Store location.

10-26
  • Bolts broke on garbage truck compressor again. Take to repair shop. Pick up garbage with small dump trucks.
  • Disconnect water line that used to supply abandoned 4" line under KwickFill Store lot.
  • Send two employees to Morris Run to connect sewer lateral for another home. Will rebill supervisors.
  • Meeting with FCNB rep. To discuss net teller services.
  • Start cleaning drying beds at stp and haul sludge to NTSWA.

10-27
  • Garbage truck still down. Collect garbage with small dump trucks.
  • Finish cleaning sludge out of drying beds at stp and hauling to NTSWA.

10-28
  • Garbage truck repaired. Empty dumpsters and pick up recycling.
  • Level off fresh sand in drying beds at stp.
  • Lisowski start sewer line installation for new KwickFill Store.

Back to Table of contents