| Date |
Activity |
| 10-28 |
- Level new sand in drying beds at stp.
- Contractor core hole in manhole on Taber St. for sewer line to new KwickFill development.
- Attend class at Penn College on new UCC rules.
|
| 10-29 |
- Installation of sewer line to KwickFill starts today.
- Ribbon cutting for new section of Rt. 15 done in the afternoon.
|
| 11-1 |
- Send 2 employees to Morris Run to install water line to new home. Will send bill to Morris Run Authority for labor reimbursement.
- First manhole installed on sewer line to KwickFill.
|
| 11-2 |
- Winterize pool and restrooms at park.
- Install meter pit to new home at Morris Run.
- Measure length of birm for new sluice pipe along S. Wmsn. Rd. Old pipe is falling apart and plugging up.
- Contractor install 300' of sewer line toward new KwickFill.
|
| 11-3 |
- Second manhole installed, then sewer line started toward 3rd manhole for new KwickFill Store.
- Send one employee to Wastewater Class at new Blossburg Fire Hall.
|
| 11-4 |
- Third manhole installed, then sewer pipe installed toward last manhole.
- Meeting with company rep. to discuss costs of new bar screen for stp pump house.
|
| 11-5 |
- Send two employees to work on meter pits at Morris Run.
- Fourth manhole installed, then outside drop inlet put together to bring line up to 6' depth.
|
| 11-8 |
- Install 120' of 15" storm drain along S. Wmsn. Rd. Have to order catch basin for upper end of storm pipe.
- Install 65' of sewer line from fourth manhole south under Boone Run Road before it is blacktopped. Mark end of sewer pipe with long wooden plank.
- Company,rep. in to replace cutting teeth on comminutor at stp pump house.
- Clean both CI2 contact pits
|
| 11-9 |
- Company rep. finish work on comminutor at stp pump house.
- Dig out section of Boone Run Rd. where sewer line was installed under it. Tamp area and fill in with #4 stone and 2A on top.
|
| 11-10 |
- Haul 2A stone from Bloss Mtn. Quarry for stockpile at garage.
- Pick up oak wood from House's Sawmill and store in pole barn at garage until ready to use by water company.
- Problems with backwash controls at Bellman Filter. Call Dave Jones to repair.
- Pick up PaDOT approved catch basin, frame and lid from McCarroll Precast to use at storm drain project on S. Wmsn. Rd.
|
| 11-11 |
- Haul OGS stone for stockpile at garage.
- Blacktop driveway on S. Wmsn. Rd. where storm drain was installed.
|
| 11-12 |
- Install catch basin at end of storm pipe that was installed on S. Wmsn. Rd.
- Put salt/cinder spreaders on trucks.
- Have to order parts to connect existing storm pipe into new catch basin along S. Wmsn. Rd. Leave barricades around hole until parts arrive.
|
| 11-15 |
- Warmer temperatures this week. Have crew get garage doors sealed and windows insulated before winter.
- Switch equipment around in garage stalls so ready for snow.
|
| 11-16 |
- Haul wastewater from Bellman Filter basement and dump into sewer manhole at park.
- Start work on replacing shingles on restroom behind Rec. Bldg. Got half of roof done today.
- DEP at Morris Run filter plant all day doing performance tests.
|
| 11-17 |
- Finish other half of roof on restroom behind Rec. Bldg.
- Send one employee to sewer class in Mansfield.
- Home on N. Wmsn. Rd. burned during the night. Turn off water service in morning.
|
| 11-18 |
- Dan and I attend Rural Water meeting at Canton.
- Install fittings on S. Wmsn. Rd. storm drain to get pipe connected to catch basin that was installed on 11/12.
- Codes Official inspect framing for new KwickFill Store.
|
| 11-19 |
- Repair cellar drain pipe along Granger st. that was broken during water line installation this summer.
- Put up Christmas lights.
- N. Wmsn. Rd. homeowner never showed up for meeting on his home today. Solicitor will have to write up a new letter.
|
| 11-22 |
- Trim brush by Main st. bridge for better visibility from new Fire Co. driveway.
- Talk to M. Stoudt about emergency lighting at Rec. Bldg. He will check out.
- Mail out information for next Planning Commission meeting.
- Mail out letters to delinquent garbage customers.
- Received letter from N. Wmsn. Rd. homeowner about scheduled meeting on 11/19. He is in Florida and unable to make it. Sent copy of letter to solicitor.
|
| 10-23 |
- Put out 27 delinquent stickers.
- Dan and I meet with Rural Water rep. about watershed reports.
- Outside wooden partitions at ends of softball restroom vandalized. Send employees over to check damages.
- Sub-grade on north side of KwickFill ready for blacktop. Paving to start tomorrow.
|
| 11-24 |
- Pave north side of KwickFill store parking lot and part of Boone Run Rd.
- Work on sewer line at Health Center.
- Shut down Bellman filter late at night because of heavy rains. Got over 2" of rain. Turn on R&G well.
|
| 11-25 |
- Start Bellman filter back up.
- Clean up junk metal at garage.
- Install 18" storm drain from White st. catch basin to Coal Run so not have to maintain deep ditchline. Haul in dirt to fill over pipe in ditch.
- Work on installing new framework for outside partitions to softball field restrooms.
|
| 11-26 |
- Shut off three delinquent customers. Turn water back on after payments were made.
- Pave rest of Boone Run Rd. by KwickFill Store down to cul-de-sac. Start paving south end of parking lot, but couldn't finish because rain messed up sub-grade. Suppose to be back next Wednesday to finish job.
|
| 11-27 |
- Heavy rain last night. Shut down Bellman filter again and turn on R&G well.
|
| 11-28 |
- Employees off work-1st day of deer season.
- Start up Bellman filter and turn off R&G well.
- 200 tons of sand delivered today. Push up in pile and will be used for anti - skid this winter.
|
| 11-29 |
- Four employees take off an extra day for deer season.
- Pump excess water out of pit behind 1MG tank.
- Dave Jones and I start preliminary work on 2005 water budget. Need more information from Leesa before finalizing figures.
- Planning Commission meeting - Approve subdivision for Crawford and Rakoski. Will take maps to Council next. Members discussed Home Occupation -- definition, as submitted by Boro solicitor.
- Tioga County Commissioners meet at Council room in evening.
|
| 12-1 |
- Finish filling ditchline where pipe was installed on 11/26.
- Clean leaves off catch basin grades around town.
- Work on new metal framework for partitions at softball restrooms.
- C. T. Co. rep. in to reprogram Boro telephones.
|
| 12-2 |
- Dig up plugged catch basin on corner of Granger and Carpenter Sts. Install new basin.
- Turn off 2 delinquent customers. Turn on one after payment is collected.
|
 |
|
George Lloyd Borough Manager
|