| Date |
Activity |
| 1-1 |
- Happy New Year.
- Rain heavy during day; change to freezing rain at night.
- Power off to Blossburg late in evening. Shut down Bellman filter.
- Call for freezing rain changing to snow. Call crew to come in early tomorrow to plow and cinder roads.
|
| 1-2 |
- Did not get as much snow as anticipated. Plow snow then salt and cinder roads.
- Water level in 1-MG storage tank dropping faster than it should. Call Cleveland Brothers in morning and they brought a 125 kW generator to run R & G Well. Unit was delivered before noon and we had connected and running well by 2 PM. Water level in 1-MG tank at 16'. Water dropping about 14,000 gallons per hour.
- Discover excess water being used by Plant #1 , so went and talked with personnel. They rented a portable generator to operate their water supply and shut off water from Authority water system.
- Water level at 14.9' in 1-MG tank by 5PM.
- Rent 50 kW generator to run pumps at stp pump house.
- Power to town by 6:30 PM, so start up Bellman filter so 1-MG tank can be filled back up.
- Leave generators running at R & G well and stp pump house.
- Boro offices closed, because portable generator not connected yet.
- Calling for more snow tonight. Have crew come in early to plow.
|
| 1-3 |
- Electric off to Bellman filter in morning. 1 MG tank up to 20'.
- Electric back on to filter in afternoon, so start plant back up again.
- Plow snow all day. Calling for 6-18" by tomorrow morning.
- Pump sludge from secondary clarifier. Finally start to get some clear liquid.
|
| 1-4 |
- Crew in early to plow, then salt and cinder roads.
|
| 1-5 |
- Shut down generator at R&G well and turn power back on from GPU.
|
| 1-6 |
- Clean snow off Main St. and haul away.
- Order more salt and cinders for stockpile.
- Connect wiring for new CI2 analyzer at Bellman filter.
|
| 1-7 |
- Crew in early to plow snow.
- Two loads of salt delivered to stockpile in afternoon.
|
| 1-8 |
- Plow slush off roads, then salt where needed. Roads melting nicely.
- Two loads of cinders delivered today and push into pole barn.
- Start picking up Christmas trees and hauling to stp, where we will chip up.
- Ground water on Granger St. freezing into dirt road causing bumpy road. Level off area with 1 B stone.
- Disconnect 50 kW generator at stp pump house and take back to Central Equipment.
- Check out installation of generator at Boro Hall with Dave Jones. Start mounting some panel boxes to wall.
|
| 1-9 |
- Dave Jones work at Bellman filter to figure out control wires for call out box.
- Haul sludge from Be1lman filter basement to sewer manhole at park.
- Arrange date for reconvened meeting between Authority members and Authority engineer.
|
| 1-10 |
- Three loads of cinders delivered to garage. Push into pole barn.
- Work on control wires at Bellman filter.
- Re plumb new CI2 injection point at Bellman filter, which will work better for new CI2 analyzer .
- Company called about fiberglass grates for top of trickling filter media at stp. Should be delivered early next week.
|
| 1-13 |
- Take down Christmas lights and store in basement of Boro Hall.
- Dave Jones draw up revised electrical schematics for Bellman filter. Will get copies made for plant.
- One load of cinders delivered and pushed into pole barn.
- Council meeting.
|
| 1-14 |
- Work at Boro Hall identifying circuit breakers in panel box So it can be determined what the generator can service.
- Budget meeting in morning to discuss insurance packages.
- Mail signed Agility paper work to PennDot.
- Three loads of cinders delivered and pushed into pole barn.
|
| 1-15 |
- Fiberglass grates delivered in morning. Take to stp and place on top of filter media. If work out good, will order more later .
- Meeting with Scott Bray in morning to discuss addition of more drying beds at stp.
- Wrap up cables for generator at R & G well So ready when Cleveland Brothers pick up 125kW generator at end of week.
|
| 1-16 |
- Connect natural gas supply line to exhaust to generator at Boro Hall.
- LRM connect new flow meter chart at stp.
- Reconvened Authority meeting to discuss portable generator, hydro study and municipal agreement with Morris Run.
- Snow during night. Call someone to come in early to salt roads.
|
| 1-17 |
- Salt and cinder roads around town.
- Amrex deliver chemicals to Bellman filter and stp.
- Pump sludge from secondary clarifier to drying bed. Dirty at first, but cleaned up quickly.
- Cleveland Brothers pick up 125 kW generator from R & G well.
|
| 1-20 |
- Mike Stoudt connect small computer at Bellman filter to record electrical use of plant so that correct size of generator to run plant can be determined.
- + 1" of snow last night. Salt roads in morning.
- New recirculating pump at stp not running. Pull pump and call company about getting it repaired.
- Push four loads of cinders into pole barn at garage.
|
| 1-21 |
- Real cold temps. predicted for all this week.
- Comminutor at stp pump house stuck because small towel caught in cutting teeth. Got Comminutor running again after towel pulled out.
- Work on footbridge grant application; will go to Planning Commission meeting tonight for their approval.
- Order materials for generator connection at Boro Hall.
|
| 1-22 |
- Call Eagle Equipment about garbage truck compactor bushings. Representative will come look at unit next week.
- LRM connect new CI2 residual analyzer at Bellman filter.
- Put new weather-stripping on two Boro garage overhead doors.
|
| 1-23 |
- Mike Stoudt pull computer from Bellman filter and put at R & G well to record electrical use there.
- Start work installing new electrical panel and conduit in Boro Hall basement for generator.
- Meet with Mark Dalton on some of Boro's insurance packages.
- Discuss footbridge application with Jerome Ogden.
- Snow late in day. Call in someone to salt hills and busy intersections.
|
| 1-24 |
- Work on Boro Hall generator wiring.
- Salt and cinder roads that weren't done last night. Had to plow some roads that had snow drifted into them.
- Take information to Covington Township about property purchased from Jack Kelly, next to stp. Want to get all paperwork done for any possible stp expansion.
- Talk to Kerry Gykis about county questionnaire for local communities. Boro has to make copies of survey then mail out with return envelope. Boro then has to re-bill County for costs associated with mailing.
- Take pictures of footbridge to send with grant applications.
|
| 1-25 |
- Replace expansion tank in meter pit at Mitchell trailer park.
|
| 1-26 |
- Snow heavy in afternoon. Call crew in to plow off hills and busy intersections so they can be salted.
|
| 1-27 |
- Crew in early to plow then salt and cinder roads.
- Water consumption to town really high. Some usage can probably be attributed to customers letting water run because of cold weather.
- Go out and listen for any big leaks.
- Dan finish revised O & M plans for filter plants. Make copies to put in books.
- Finish preliminary wiring at Boro Hall for generator. Call Dave Jones to see what has to be done next.
|
| 1-28 |
- Salt and cinder roads around town where needed.
- Listen for water leaks. May have a leak on Rt. 15 by Maple Hill Rd.
- Eagle Equipment check out garbage truck compactor. Will send us the part to fix the problem.
- Work on Boro Hall generator. Get unit ready so it can be checked out tomorrow during a trial run.
|
| 1-29 |
- Snow early in morning. Salt roads early then plow off slush later in the day where needed.
- Listen for water leaks on Rt. 15. Have to isolate sections of water main so it can be determined where leak is located.
- Start up generator at Boro Half and everything checked out. Start transferring some breakers to sub-panel that generator is connected to.
|
| 1-30 |
- Allison Crane at Island Park to look at footbridge so estimate can be worked up for use of Crane.
- Meet with Jerome Ogden and Doyne Chartreau to discuss footbridge.
- Locate possible leak at intersection of Rt. 15 and Maple Hill.
|
 |
|
George Lloyd Borough Manager
|